Planning and logging preventive maintenance on your production machines in SavantPLM
Machine Maintenance keeps track of the recurring care your production machines need — lubricating ways, changing coolant, cleaning filters, an annual service call — and a record of what was actually done. It answers two questions: what is due or late? and what was done to this machine, and by whom?
Maintenance is calendar based: a plan repeats every N days. Run hours and part counts are not tracked.
Go to Manufacturing → Machines and choose Maintenance in the bar at the top. Machines themselves (name, type, manufacturer, model, serial number) are added in Admin Settings → Machines. A machine must exist before you can add a plan for it.
Use the machine drop-down above the plans to show a single machine, and Clear to see them all again. The counters at the top of the page show how many plans are overdue, due soon and on schedule.
A plan is one recurring task on one machine. Click + Add Plan and fill in:
| Field | Description |
|---|---|
| Machine | The machine the task is done on. |
| Task | What to do — e.g. "Lubricate ways and ball screws". |
| Every (days) | How often, as a whole number of days from 1 to 3650. 30 is about monthly, 90 quarterly, 365 yearly. |
| Last done | Optional. When it was last done, if you know. |
| Next due | Optional. If you leave it blank, the next due date is last done plus the interval, or today plus the interval when there is no last done date. |
| Notes | Anything useful — the part number of a filter, which lubricant to use, a procedure number. |
You can Edit a plan's task, interval, next due date and notes, and delete a plan you no longer need. Deleting a plan keeps its service log entries; they stay in the log for the machine.
Each plan shows a status based on its next due date:
Plans are listed with the soonest due first, so the late ones are always at the top.
When a planned task is done, click Log service on that plan's row. For work that is not on a plan, such as a repair, click + Log Service at the top and type the task. Fill in:
⚠ Logging a service for a plan moves that plan's Last done and Next due dates: next due becomes the performed date plus the interval. Entering an older service never moves the dates backward — only the most recent service counts.
Below the plans, the Service Log lists the most recent 50 services, newest first, for all machines or the machine you chose: the date, machine, task, who did it, hours and notes. A service logged without a plan (a repair, for example) appears here too. Deleting a log entry does not change any plan's dates.
Anyone in the workspace whose plan includes Manufacturing can view maintenance. Adding, editing and deleting plans and logging or deleting services requires an Editor with the Manage Work Orders permission. Viewers see the page without the Add and Log buttons.
The two are separate on purpose. Machine Maintenance (Manufacturing → Machines) is upkeep of production machines. Equipment & Calibration (Quality → Equipment) tracks measuring instruments and their calibration certificates.
If you have questions, please visit our Contact page.