Features

Everything between the drawing and the shipping dock

One system for parts, BOMs, engineering changes, engineering projects, inventory, orders, work orders, quality and planning. Start with the features you need and upgrade as you grow.

30-day free trial on every plan. Each workspace has a sandbox for testing. The demo comes with sample parts, BOMs and orders already loaded.

01Parts

Your whole parts library, in the cloud

Store, search, and manage every part your team builds or buys, with full revision history, supplier data, and specs all in one place.

  • Cloud-Based Data — access your parts from any device, anytime
  • Part Info & Data — Vendor PN, Mfg PN, electrical specs, cost, and more
  • Powerful Part Search — fast search and filters with Excel export
  • Excel Import & Export — load your parts, bills of materials and vendors from Excel with a preview before anything is saved, and export them whenever you like
  • Custom Fields — add your own text, number, date, or dropdown fields to any part
1 / 2

Bracket, mounting, 6061

100-2041  ยท  Rev C
Released
Vendor PNMCM-9057K21
Mfg PNBRK-2041-C
Unit cost$4.18
Material6061-T6 aluminum
Finish customClear anodize
Inspect customFirst article
100-2041.step100-2041_C.pdfanodize_spec.pdf
Search 12,480 parts in milliseconds. Export any result to Excel.
02BOMs, cost & materials

Navigate your product structure with confidence

Build multi-level bills of materials, roll up costs automatically, and always know what raw materials and purchased parts go into each assembly.

  • BOMs — multi-level bill of materials with fast up/down navigation
  • Where Used — instantly see every assembly and product a part appears in
  • Cost Rollups — automatic material and labor cost calculations up the BOM tree
  • Automatic Weight Calculation — assembly weights add up through the BOM, or use a measured weight when you weighed the finished assembly
  • Assign Raw Materials — link stock materials to manufactured parts with units of measure
1 / 2
Camera Gimbal AssemblyRev D
  • GMB-1000Gimbal, complete1$212.40
    • GMB-1100Frame sub-assembly1$61.05
      • 100-2041Bracket, mounting2$8.36
      • 100-2077Side plate2$14.20
    • GMB-1200Motor module3$126.00
    • FST-0412M3 x 8 SHCS24$3.12
Rolled-up cost
materials + routing labor · 1.86 kg
$212.40
Rolled-up weight1.86 kg (4.10 lb)
Where used3 assemblies
Raw material · 100-2041
Linked
Stock material6061-T6 bar, 1.5 in
Used per part0.35 ft
03Change management

Engineering changes, tracked and approved

From the first request to the released change notice, SavantPLM gives every change a documented trail, with signoffs, comments, and automatic notifications.

  • Engineering Change Requests (ECRs) — capture issues and proposed changes before they become formal orders
  • Engineering Change Orders (ECOs) — route changes through a formal review and approval workflow with signoffs
  • Engineering Change Notices (ECNs) — communicate released changes to the broader team
  • Prototype Requests (EPRs) — track prototype builds, part lists, and status through each build phase
  • Notifications — real-time alerts for @mentions, ECO approvals, rejections, and releases
RequestECR-000014

Bracket cracks at the bend. Thicken wall to 2.5 mm.

OrderECO-000009

Rev C → Rev D on 100-2041 and 2 assemblies.

NoticeECN-000009

Sent to purchasing, stockroom and the shop floor.

MREngineering reviewApproved
DKQualityApproved
TSOperationsWaiting

Nothing becomes the current revision until every approver signs off. Every step is time-stamped.

Prototype · EPR-000006

Gimbal frame, build 2

Assembly phase
Notifications
  • @Dana mentioned you on ECO-000009
  • ECO-000008 was released
  • 04Engineering projects

    Run a product development project from one page

    Plan the work, capture what the product has to do, hold the design reviews and prove it works, with the records an ISO 9001 design and development process asks you to keep, all linked to your parts and ECOs.

    • Owner, team and roles — every project gets a number, an owner, and a team with the role each person plays
    • Design inputs and requirements review — customer, functional, regulatory and standards requirements and the consequences of failure, then a recorded review with the reviewer, the date and how conflicts were resolved
    • Design reviews — each has a number, a date, time and place, the attendees and the function each represented, minutes, actions and attached files, plus a list of every review across projects
    • Verification and validation — record each check against the requirement it covers, with the method, a pass or fail result, who did it and when; a failure becomes a task to fix it
    • Tasks, dependencies and schedule — tasks and design reviews can wait for each other, and the Gantt chart shows it. Every new project starts with your own New Product Checklist
    • Design outputs — link the ECOs that release the design, and record the acceptance criteria and what is essential for safe use
    • A history you can show an auditor — every change to the project record, with who made it, when, and the old and new text. Discussion threads with @mentions keep the conversation next to the work

    SavantPLM helps you keep the records ISO 9001 clause 8.3 expects. Certification belongs to your company and its quality system.

    PRJ-000007 · Gimbal controller
    Active
    RequirementsApproved

    Reviewed Oct 14

    Design reviews2 of 3

    Final review Dec 12

    Verification5 of 7

    2 still to run

    8 of 12 tasks done · ECO-000011 waiting for the final design review

    DRV-000003 · Preliminary design review
    Completed
    WhenNov 20, 10:00 AM MST
    WhereConference Room B
    MRMechanical · M. Reyes
    DKQuality · D. Kim
    PCCustomer · P. Cho
    History
  • D. Kim changed Requirements Review: Status from In Review to Approved
  • M. Reyes linked ECO-000011
  • 05Inventory & manufacturing tools

    From the stockroom to the production floor

    Track on-hand inventory across locations, identify reorder needs, and build accurate routing and costing structures for every manufactured part.

    • Inventory Balance & Health — on-hand quantities by location vs. safety stock and reorder thresholds
    • Bin Barcodes — print and scan bin labels to instantly pull up part details or verify quantities
    • Labor Classes — standardize labor rates by operation type for accurate cost rollups
    • Work Centers — define machine and setup rates per work center and assign operations to them
    • Routing Management — step-by-step manufacturing routings per part and revision
    PartBinOn hand
    100-2041Bracket, mountingBIN-000012184
    GMB-1200Motor moduleBIN-00003122
    FST-0412M3 x 8 SHCSBIN-0000071,940
    PKG-0090Shipping cartonBIN-0000440  EMPTY
    • Received against PO-1042+200
    • Moved BIN-000012 → BIN-00003140
    • Scrapped: damaged in handling−3
    Bin label
    BIN-000012
    Inventory health
    GMB-120022 on hand · reorder at 30Low
    Routing · 100-2041 Rev C
    3 steps
    OperationWork centerLabor class
    10 CutSawOperator
    20 MachineCNC millMachinist
    30 DeburrBenchOperator
    06Purchasing and sales

    Order, receive and ship without a spreadsheet

    Buy parts, receive them into bins, take customer orders and ship them with tracking, all tied to the same inventory.

    • Purchase orders with receiving straight into stock
    • Sales orders with availability checks on every line
    • Ship in pieces: carrier and tracking number, with a shipment history
    • Linked work orders: make what a sales line needs, or build for stock

    SO-000027  ยท  Northwind Robotics

    Gimbal, complete × 40
    Partially shipped
    24 shipped16 in production
    Shipment 1 · 24 unitsUPS · 1Z 999 AA1 01 2345 6784Shipped
    Work order WO-00011816 units · due FridayIn production

    Purchase orders work the same way in reverse: receive against the PO and stock lands in the right bin.

    07Manufacturing execution

    Connect engineering data to the production floor

    MES features bring SavantPLM from the engineering office to the shop floor: scheduling, dispatching, and measuring every work order against plan.

    • Work Orders — create, assign, and track work orders with routing operations and real-time status
    • Production Schedule — Gantt chart view of all work orders on a timeline to spot gaps and overlaps
    • Dispatch List — every open operation by work center so operators always know what to build next
    • Material Requirements — automatically calculate shortages across all open work orders
    • Production Efficiency — actual vs. planned labor hours by work order and operation
    1 / 2
    WO-000118  Gimbal, complete × 16
    In progress
    • Cut and deburrR. Alvarez
    • CNC machineJ. Park
    • Anodize (outside)in progress
    Production schedule
    WO-000118
    WO-000119
    WO-000121
    Dispatch list · CNC mill
    WO-000118 · op 20 MachineGimbal frame · 8 leftRunning
    WO-000121 · op 10 MillSide plate · 20 leftQueued
    08Display screens

    Put the shop floor on a TV

    Show live work orders, dispatch lists and quality alerts on a wall display, in a conference room or at a workstation — no login, no extra user seat, and it refreshes by itself.

    • Pick What Shows — work orders, dispatch list, machine status, open NCRs and CARs, calibration due, low stock, purchase orders due, sales orders to ship, open ECOs, or a company message
    • Current Work Order — a workstation’s running job: quantity done, who started it, how long it has run, the routing progress and a picture of the part
    • Dispatch List by Work Center — show every work center, or one work center’s queue
    1 / 2
    Acme RoboticsShop floor · updated -
    --:--

    Work orders

    2in progress
    5open
    1overdue
    WO-000001Cobot, 10 kg
    In progressdue Nov 6
    WO-000002Controller cabinet
    In progressdue Oct 24

    Dispatch list

    WO-000003 · op 10 MillBase housing · 5 left
    Queued
    WO-000001 · op 40 WireCobot, 10 kg · 2 left
    In progress
    WO-000004 · op 20 AssembleBase assembly · 4 left
    Queued

    Current work order · Assembly 1

    WO-000001work order
    4 / 10completed
    47:00running
    20001 — 6-DOF Cobot, 10 kgop 40 Final assembly · started by Pat Lee
    ✓ 10 Machine✓ 20 Wire▶ 40 Assemble50 Test

    Open NCRs

    3open
    NCR-000002CSF-32 flange OD out of tolerance
    5 days
    NCR-000004Encoder connector damaged
    2 days

    Open CARs

    2open
    1overdue
    CAR-000001Incoming inspection plan
    overdue
    09Quality management

    Capture, track, and resolve quality issues fast

    Quality tools give your team a structured way to log non-conformances, drive corrective actions, and close the loop, all linked to the parts and work orders involved.

    • Non-Conformance Reports (NCRs) — document defects with severity, root cause, disposition, and links to the part, work order, or purchase order
    • Corrective Action Reports (CARs) — assign owners, set due dates, and track corrective and preventive actions from open to completed
    • Linked Records — NCRs link to CARs so every non-conformance has a traceable path to resolution
    1 / 2
    NCR-000041
    Open

    Bracket hole out of position

    SeverityMajor
    DispositionRework
    Part100-2041 · lot 2310
    Linked toWO-000118, PO-1042
    CAR-000012 · corrective action
    In progress
    OwnerD. Kim
    DueNov 28
    Traceable path
    NCR000041
    CAR000012
    Closedpending
    10Serial numbers and inspection

    Know exactly which unit you shipped, and what it passed

    Give every unit you build its own serial number, test it against a checklist for that part, keep pictures of it, and ship it against the order. If a customer calls about one unit, its whole history is one search away.

    • Serial Numbers Your Way — set a format from the part number, work order, date and a running count, choose when the counter restarts, and make a batch from a work order in one click
    • Inspection Plans Per Part — an ordered list of steps for each part number, with pass/fail checks, measured values with minimum and maximum limits that fail automatically, and notes; reorder steps by dragging
    • Every Unit Keeps Its Own Checklist — the checklist is copied when the serial is made, so changing a plan later never rewrites what a unit was tested against
    1 / 2
    Serial numbers · BRK-100
    BRK-100-261121-003WO-000042 · inspection in progressIn inspection
    BRK-100-261121-002WO-000042 · passed all 3 stepsPassed
    BRK-100-261121-001SO-000027 · shipped Nov 21Shipped
    Serial number format
    Format{PN}-{YYMMDD}-{SEQ:3}
    Counter restartsEvery day
    Inspection plan · BRK-100
    Step 1Torque check
    Step 2Functional test
    Step 3Final visual
    11Material requirements planning

    Know what to buy and build, before you run short

    MRP turns demand into a plan. It nets what you need against stock, open purchase orders, and open work orders, then tells you what to order or make, and when.

    • Planning Run — explode demand through every level of the BOM and net it against on-hand stock and scheduled receipts
    • Demand From Your Orders — open sales order lines and manual forecast entries, planned over a horizon you choose
    • Lead Times, Safety Stock & Minimum Orders — planned orders are released one lead time early, hold safety stock, and respect each part’s minimum order quantity
    1 / 2
    Planning run · 12 weeks
    Complete
    46Parts planned
    9Planned orders
    3Shortages
    Demand
    SO-000027 · Gimbal, complete16 open · due Nov 28Sales order
    Forecast · Gimbal, complete20 per month, Dec to FebForecast
    Part settings
    Lead time14 days
    Safety stock25
    Minimum order50
    Can I build 50?7 today

    The small things that make it feel finished

    Roles and permissions

    Viewers, editors and admins. People only change what their role allows.

    Dashboards

    Change requests, prototypes and trends for engineering, at a glance.

    Excel in and out

    Import with a preview. Export any list whenever you like.

    Cloud, nothing to install

    Works in any browser. SavantVA is optional, for opening local CAD files.

    Custom fields

    Add text, number, date and drop-down fields to your parts.

    Fast

    Built for speed, so a search or a save never makes you wait.

    Suggestions box

    Anyone can submit an idea, or one for someone else. Each gets a number, an owner and a reply.

    30-day free trial

    See it with your own parts.

    Try the demo with sample data already loaded, or start a trial with your own. No credit card to look around.