1. 01
  2. 02
  3. 03
  4. 04
  5. 05
  6. 06

Engineering & manufacturing software for hardware makers

01Inventory

Does your company have trouble keeping track of inventory?

A spreadsheet nobody trusts. Sticky notes on the rack. A count that was right last Tuesday. SavantPLM puts every part in a bin, with what's on hand, what's spoken for and what's on the way.

30-day free trial. Runs in your browser. Nothing to install.

Brackets: 40? ask Dave before using any
100-2041Motor bracketA-0312040
Inventory_2026_FINAL.xlsx
C14: #REF!
300-0007M4 x 10 screwC-114001200
PCB rev C: 12 in a drawer?
210-0330Controller PCBE-0115025
Bearing 6202 = 0??
(I just saw some)
400-6202Bearing 6202-2RSB-0736050
qty?  |  qty?  |  see email
500-1120Wire harness, 6-pinD-022040
Count again Friday. Numbers don't match.
200-0100Drive assemblyF-12242416
Who took the spacers from bin 9??
100-0712Spacer, 12 mmA-09310480
? qty?
Live. Updated as parts move.7 of 1,284 parts
02Engineering

Which revision did the shop build?

If the answer starts with "let me check my email," you're not alone. Drawings travel as attachments, filenames pick up words like FINAL and NEW, and the old one is still on the shop PC.

  • One part record with every revision, its files and its history.
  • Changes go through an ECO that's reviewed and approved before it's released.
  • BOMs point to the released rev, so everyone downstream sees the same thing.
MK
Fwd: Fwd: bracket change, use the new one
bracket_final_v3_REAL.pdf
Which?
JR
RE: is rev B still good for the Acme run?
no attachment
Unanswered
TS
updated drawing (ignore the last one)
bracket_final_v3_REAL (2).pdf
Duplicate
PC
Shop PC \ Desktop \ drawings
bracket_revB_OLD_dontuse.pdf
Built from
Three versions in circulation. The shop built the one marked "don't use."
100-2041

Motor bracket

Released · Rev C

Rev C: slot widened to 6.5 mm for motor clearance. Released Nov 9 by ECO-000047.

ECO-000047 · Widen motor slot3 approvers
RequestedNov 3
ReviewedNov 5
ApprovedNov 7
ReleasedNov 9
200-0100 Drive assembly Rev DBOM
  • 100-2041 Motor bracket Rev Cx1
  • 210-0330 Controller PCB Rev Cx1
  • 400-6202 Bearing 6202-2RSx2
  • 300-0007 M4 x 10 screwx8
03Engineering + Inventory

Do you know what you can build today?

"Can we ship 15 by Friday?" shouldn't take a walk around the shop and three text messages. When the BOM and the bins live in the same place, the answer is clear.

  • Availability roll-up from the released BOM against what's actually on hand.
  • Shortages called out by part, with what's already on order and when it's due.
  • Change the quantity and see the answer change with it.
Sales · 9:02Customer wants 15 drive assemblies by Friday. Can we?
Production · 9:20Probably? Let me check the brackets.
Production · 10:05Spreadsheet says 40 but the bin looks low
Sales · 10:41I told them yes already…
Production · 11:30We have 12. Purchasing says more are coming "soon"
Two and a half hours, and the promise was already made.
200-0100 · Rev DDrive assembly
15 to build
12
Can build 12 today. Short 3 brackets.
40 on order, due Nov 24.
04Manufacturing

Is the shop floor working from the latest?

A traveler printed three weeks ago doesn't know about last week's ECO. And once it leaves the office, nobody can see which step it's on without walking out there.

  • Work orders built from the released BOM, so the rev on the floor is the rev in engineering.
  • Traveler steps checked off as they happen, with who and when.
  • Kitting pulls from bins, so inventory stays right without a separate count.
SUPERSEDED
REV C · NOV 9

TRAVELER

Drive assy · qty 16
Printed Oct 28 · Drawing Rev B
  1. ✓Kit parts
  2. ✓Cut & deburr brackets
  3. ?Machine motor slot (5.5 mm)
  4. First-article inspect
  5. Assemble
  6. Final QC & pack
16 brackets machined to the old slot size. Nobody knew until assembly.
WO-000318

Drive assembly × 16

Released BOM · Rev D
0 of 6 stepsDue Nov 21
  1. Kit partsPulled from A-03, B-07, C-11, E-01
  2. Cut & deburr brackets
  3. Machine motor slot6.5 mm per Rev C
  4. First-article inspect
  5. Assemble
  6. Final QC & pack
Everyone sees the same step, live.
05Sales & shipping

Where did that order go?

A customer calls about their order. Sales asks shipping, shipping asks production, and someone promises to call back. Every hand-off is a place for an order to get lost.

  • Sales orders commit stock the moment they're entered, or point to the work order that will fill them.
  • Partial shipments tracked line by line, with carrier and tracking number.
  • Anyone can answer the call because the status is right there.

Acme calls: "Where's our 40 drive assemblies?"Front desk takes a message

Sales emails shipping: "Did Acme ship?"Shipping: "Which PO?"

Shipping checks the packing slips binderFinds 24. Not sure about the rest

Production: "The other 16 are still on the floor, I think"No date given

Four people, 40 minutes, and the customer still doesn't have an answer.
SO-000212 · PO 4471

Acme Robotics · 40 × Drive assembly

Partially shipped
  1. Order entered40 units, ship complete by Nov 22
  2. 24 committed from stock16 on WO-000318, ships when it closes
  3. Shipment 1 · 24 unitsUPS 1Z 84A 2W1 03 4471 0021
  4. Shipment 2 · 16 unitsShips when WO-000318 closes, Nov 21
24shipped
16in production
06All of it, connected

One source of truth, from the drawing to the box on the truck.

Every question above had the same root cause: the answer lived in someone's inbox, spreadsheet or head. In SavantPLM each step hands its data to the next, so nothing gets retyped and nothing gets lost.

Engineering

Parts, revisions, BOMs, ECRs and ECOs

1,284parts under revision control
6ECOs in review

Inventory

Bins, on hand, committed, on order

412bins tracked
$186kon hand, valued

Manufacturing

Work orders, travelers, kitting

9work orders in progress
94%on-time this month

Shipping

Sales orders, shipments, tracking

23orders shipped this week
0"where's my order?" scrambles
ECO released → BOM updated BOM → availability and shortages Work order → kits pulled from bins Sales order → stock committed, shipment tracked

Built for teams that make physical things

Hardware is hard. Managing it shouldn't be. SavantPLM: one platform for hardware engineering and manufacturing.

Hardware startups

Your first real BOM, your first ECO, and a build that has to match the design.

Small manufacturers

Engineering, the stockroom and the floor on one system instead of five.

Engineering teams

Revision control and change approvals without a six-month PLM rollout.

30-day free trial

Answer all five questions from one place.

Try the demo with sample parts, BOMs and orders already loaded, or create an account and start a trial.